News
- 2011-10-04 20:49:21
-
Ningbo Qiaopu Electric Co., Ltd. bodyguards principle duty personnel
The first Ningbo Qiaopu Electric Co., Ltd. is the bodyguard who has been under obligation to perform duty, the principle is formulated.
The second bodyguard who's black coat, the Department on behalf of the company perform their duties.
Article bodyguards 24 hours a day service should perform his craft, his work each class black coat, was developed by the bodyguards class standards promulgated.
Article bodyguard duty personnel rules are as follows:
1 plant materials into the work of inspection and release. 2. Factory and office premises of all kinds of upheavals in the prevention, alert and plant (room) inspection issues.
3 workshop and office premises of sudden upheavals in the emergency measures. 4 into the working factory and office premises of the foreign guests and staff of the control, contact the canceled items. 5. To avoid theft, workshop and office premises to assist in maintaining order. 6. Into the control of the vehicle to work plant matter. 7. Other matters to pay to do the disposal.
Article bodyguards in addition before the duties of the Company shall comply with all rules, in particular, should strictly comply with the following code:
1 should obey their superiors decree absolute, it is the implementation of obligations, not favoritism favoritism.
2. Usually to be cautious stance and good execution of their duties seriously, neither haughty nor humble.
3 hour black coat and progress should be alert in case of serious disaster, they should unruffled, determination agile, as appropriate to renew, and immediately declared superior.
4. black coat should be got rid of their clothes, appliances, etc. on emergency and should always wear a self-defense, or the storage completely, to meet contingencies.
5 black coat should be strictly booth, not good at leaving defensive or alcohol, chat, read the newspaper to study, sleep and other misconduct violations.
6. Should control the factory people, goods, vehicles, or for not hanging out properly identified certification procedures by the factory, that any ban into the plant, and an absolute stop to bring (folder) violate a ban products with the factory, in addition to workshops to be material outside of serious risk or flammable materials should be brought into the refuse.
7. Should memorize the plant over and over water, electricity, fuel, switches, door locks and fire equipment to place the address, in order to avoid temporary emergency panic, the main intersection lights, doors, windows, Li Qiang and so the defect, it shall recommend factory service unit disposal.
8 inspections should follow the path of time or when inspections are not allowed to plant everywhere.
9 AC classes, should pay attention to this matter clear, and the black coat seen in major events or turmoil, as well as log out inspection work, etc.) into the "bodyguards Diary", attach the relevant materials were sub-plant unit per day and bodyguard course review.
- Previous [Return Home] [Print] [Go Back] Next
Products Search
Contact Us
Contact Person:
Gavi ChenTel:
+86-0574-62166266- +86-15888180299
Fax:
+86-0574-62179799E-mail:
gavi@plug9.com