Home > News > Ningbo Qiaopu Electric Co., Ltd. is a continuous vulcanizing machine operation stroke

News

Ningbo Qiaopu Electric Co., Ltd. is a continuous vulcanizing machine operation stroke
2012-04-08 21:55:26
 

Ningbo Qiaopu Electric Co., Ltd. is a continuous vulcanizing machine operation stroke
1, Ningbo Qiaopu Electric Co., Ltd. before starting should be put on protective equipment, in order to work, in which high-voltage insulation protection products (such as insulated shoes, insulating gloves, etc.) should each half of the high-pressure check, and may be made of the use classes should take good care of.
2 Check Ningbo Qiaopu Electric Co., Ltd. is a continuous vulcanizing machine, with or without debris, lubrication required.
3, threading and pipe inlet, two operators to each other, pay attention to the security situation around, open the pipe plus steam, you should press the bell, and other fast full open pipe Last Reply bell signal to inlet, inlet valve can not be to slow to send the steam.
Barometer pointer down to zero, the normal operation of production, the nose shrink socket must be such as to confirm no residual pressure before open reduction socket, and shrink socket covered with asbestos cloth.
5, add material, the ban on hand come into contact with the inner sleeve part of the body are not allowed to use metal objects to the inside top plastic.
Normal driving, take-holder ban to stand, take-changers cut line, note the line the forefront thrown wounding.
7 Do not open the door of a small water wheel box.
Halfway break, stop, threading, open the shrink socket, be sure to zero the pressure gauge pointer, make sure no residual pressure, before opening shrink socket socket and covered with asbestos cloth.
9, those who start to squeeze the rubber machinery exists inside the rubber introduced, the body temperature must meet the squeeze rubber and temperature in order to boot.
10, inlet pipe, the operator of the same shall not be close to the valves.
11, high pressure steam when the red line, all personnel should stand at a safe location to confirm that no problem, before opening the steam to prevent scalding.
12, frequently check the pressure gauge is normal and should be sent to check on a regular basis.
13, where the bare conductor into the electrode box, high voltage power supply should be cut off before the operation.
Guide pulley 14, each using high voltage test press, you should check the carbon brushes is good contact, carbon brush and put a wire rack grounding wire should contact makeup in order to use
15, anti even the sulfur line is strictly prohibited by hand touch high-voltage test breakdown at.
16, the last one stopping to pay attention to:
a, cut off the power switch, check all the buttons, the handles are zero.
b, Close all valves of the steam, water and other.
c to open backwater valve.


Previous   [Return Home] [Print] [Go Back]   Next

Contact Us

  • Contact Person:

    Gavi Chen
  • Tel:

    +86-0574-62166266
  • +86-15888180299
  • Fax:

    +86-0574-62179799
  • E-mail:

    gavi@plug9.com
点击这里给我发消息
点击这里给我发消息