News
- 2012-01-04 20:56:52
-
Ningbo Qiaopu Electric Co., Ltd. power line quality product components
Today, Ningbo Qiaopu Electric Co., Ltd. carried out on the "plastic parts acceptance rules" of training.
Training as follows:
1, plug the finished product to ensure the project continues to meet the standards of thermal performance requirements;
2, in line with the factory quality assurance capability requirements;
3, on the "Factory shall establish and maintain supplier of critical components and material inspection or verification of procedures and periodic verification inspection, to ensure the quality of key components must meet the requirements of the" requirement.
For Q / QYE 2213-2002 "plastic parts acceptance rules" to modify, increase resistance to plastic parts pad requirements, according to GB2009.1-1996 section 25-2 of the requirements of the plastic parts should be at a temperature of 125 ℃ heating box, with 20N force to the ball with a diameter of 5mm surface pressure 1h, within 10 seconds the sample immersed in cold water, measure the diameter of ball indentation shall not exceed 2mm. Inspection frequency of once every half-verification tests carried out.
This training by: Ningbo Qiaopu Electric Co., Ltd. Technology Section.
- Previous [Return Home] [Print] [Go Back] Next
Products Search
Contact Us
Contact Person:
Gavi ChenTel:
+86-0574-62166266- +86-15888180299
Fax:
+86-0574-62179799E-mail:
gavi@plug9.com