News
- 2011-10-06 21:17:29
-
Ningbo Qiaopu Electric Co., Ltd., the construction of structures, cable lines
1 project quality, should be consistent with existing national standards requirements;
Qiaopu electrical cable line put into operation before the installation is complete, construction should be completed addendum as embedded parts, drilling, reaming and other needs caused by the construction decoration work.
Ningbo Qiaopu Electric Co., Ltd. cable lines installed on the building works should meet the following requirements:
And Ningbo Qiaopu Electric Co., Ltd. cable lines installed on buildings and structures of architectural work well size 2 cable should meet the minimum cable bend radius requirements. Ningbo Qiaopu Electric Co., Ltd. cable wells should have a water pit, cover the metal grate. City Power cable distribution boxes, box-type base and the location should change to meet the design requirements.
- Previous [Return Home] [Print] [Go Back] Next
Products Search
Contact Us
Contact Person:
Gavi ChenTel:
+86-0574-62166266- +86-15888180299
Fax:
+86-0574-62179799E-mail:
gavi@plug9.com