Home > News > QiaoPu company employee safety procedures book

News

QiaoPu company employee safety procedures book
2011-05-24 22:51:28
 

QiaoPu company employee safety procedures book

In order to strengthen the employees work safety, ningbo QiaoPu electric Co., LTD specially make safety procedures are as follows:
A, dangerous work should by skilled personnel as sent present supervision.
Second, happen damage, emergency victim to send the labor insurance designated hospital treatment.
three, workplace hurts probably drop object, the staff should QuanKui cap Diane.
Four, using strong corrosive concentrated acid, should use safety tools, avoid and body answered
Fifth, in dust of workers, should wear the mask and glasses.
Six, use electrical equipment, should notice whether completely and whether the insulation conductive objects close to power.
Seven, operating crane, attention shall be paid to lift the object whether anyone under nearby mansion.
Eight, use tower or the escalator, should be strict check whether strong.
Nine, glass, such as the nails or wire shall be arbitrarily discarded.
Ten, not wearing pajamas operating machinery or approached flabby. The machine operation
Eleven, tools should be placed in toolbox, kit should as far as possible on the ground.
Twelve, sharp tools should cover, and no protective circle placed in the pocket.
Thirteen, superior or welding should pay attention away from others, and should wear the necessary eyewear.
Fourteen, automobile engine, tall machine, crane its drivers must have a driver's license or for company designated personnel, unlicensed personnel shall not driving, also not practice driving.
Fifteen, driving or locomotive must strictly obey the traffic rules.
16th and special operations personnel should be clear oversight of the special danger, the homework at any time inform the working staff subordinate.
17 and when the power to closed immediately in total switch, send in open when the switch prior to open the total switch. Open the Lord with switch prior relationship contact.
eighteenth, whoever electrical machinery repair, replacement fuses inspection or other shock danger will turn off the switch then.
9th, high voltage wires homework first confirmed dead line to do homework before.


Previous   [Return Home] [Print] [Go Back]   Next

Contact Us

  • Contact Person:

    Gavi Chen
  • Tel:

    +86-0574-62166266
  • +86-15888180299
  • Fax:

    +86-0574-62179799
  • E-mail:

    gavi@plug9.com
点击这里给我发消息
点击这里给我发消息